Accessibility Skip to main content

Local Highways Maintenance Transparency Report 2026/2027

How we maintain local roads, pavements, and the wider highway network in Torbay

What we are responsible for maintaining

Torbay's highway network is predominantly urban, reflecting the densely developed nature of Torquay, Paignton and Brixham. Most roads operate within lower speed environments and support high levels of traffic, public transport, active travel, local businesses and access to essential services. The classified road network (A, B and C roads), largely subject to 30mph speed limits, provides the key links between the three towns and plays a critical role in supporting economic activity and connectivity.

In addition to the urban network, Torbay maintains a smaller rural highway network that provides vital access to outlying communities and local destinations.

Torbay Council is responsible for maintaining a substantial highway asset portfolio, including carriageways, footways, structures, drainage, street lighting, traffic signals and other highway infrastructure.

  • 576 km of carriageway
  • 909 km of footway
  • More than 18,000 street lighting and associated units
  • 13 km of vehicle restraint systems
  • 55 signal-controlled junctions
  • 37 signal-controlled pedestrian crossings
  • 30 variable message signs

A significant challenge is the continuing gap between available funding and maintenance need. Unlike many authorities with predominantly rural networks, Torbay's compact urban network experiences consistently high traffic volumes, resulting in accelerated asset deterioration and increased maintenance demands. Consequently, investment requirements continue to exceed available resources, making it increasingly challenging to maintain the network in a safe, resilient and serviceable condition while meeting the expectations of residents, businesses and visitors.

Road conditions in Torbay

Councils use road condition surveys to assess the state of their roads. The results are grouped into three categories:

  • Green – the road is in good condition and no further investigation or treatment is required
  • Amber – the road may need maintenance soon
  • Red – the road is in poor condition and should be considered for maintenance

The published official statistics for road condition include more detail about the methodology, timing and coverage of this data.

A Roads
Year Percentage of road in red category Percentage of road in amber category Percentage of road in green category
2023 2.6% 20% 77.4%
2024 3.9% 23.8% 72.5%
2025 3.1% 21.5% 75.4%
B and C roads
Year Percentage of road in red category Percentage of road in amber category Percentage of road in green category
2023 6.4% 32.3% 61.2%
2024 8.7% 31.4% 59.9%
2025 6.6% 31% 62.4%
U roads
Year Percentage of road in red category
2023 5%
2024 3%
2025 3.5%

Additional information on carriageway condition

We undertake annual condition surveys of the classified road network in partnership with WDM LTD, using their scanner system. In addition, the condition of our unclassified network is assessed on a rolling basis, focusing on streets within the highest tiers of our maintenance hierarchy.

As a predominantly urban authority, some roads designated as ‘unclassified’ still perform an important function, providing key links between business areas, industrial estates, and residential developments. Although these routes are formally lower in the hierarchy, their strategic importance means they are treated as a higher priority and are therefore subject to more frequent inspections.

What we are doing about potholes and other road defects

What is a pothole?

Our definition of a pothole is:

‘An area of the carriageway, footway or cycleway where material is lost, creating an irregular vertical edge around a depressed area. This defect is often preceded by cracking’ and can present significant risks to both highway users and the fabric of the surface.’

What we are doing to tackle potholes

Highway inspections are undertaken by a team of four Highway Inspectors, managed by the Network Manager, who are responsible for monitoring the adopted highway network, including carriageways and footways. Inspections are carried out in accordance with Torbay Council's Highway Inspection Policy, which adopts a fully risk-based approach to identifying and managing defects.

In 2025/26, approximately 4,244 potholes were repaired across the network through a combination of targeted pothole repairs and larger-scale patching works. Rather than relying on fixed dimensional criteria, defects are assessed using a range of risk factors, including location, visibility, road hierarchy, user type and the potential consequences of failure.

Our approach is centred on delivering the right repair at the right time. While temporary or interim repairs may occasionally be required, our objective is to provide durable, cost-effective solutions that address the underlying condition of the asset and minimise repeat visits wherever possible.

Torbay's annual capital maintenance programme includes a mix of reconstruction, resurfacing and surface dressing treatments. These works are delivered through SWISCo, Torbay Council's wholly owned service delivery company, using specialist subcontractors where appropriate.

Investment priorities are determined through a combination of quantitative and qualitative data sources, including SCANNER condition survey results, SCRIM skid-resistance data, pothole clustering analysis, reactive maintenance expenditure, highway inspections and customer reports. This evidence-led approach enables the Council to target funding where it will achieve the greatest benefit for network condition, safety and resilience.

How members of public can report potholes and other highway defects

We currently offer a reporting tool via the Service Request List on SWISCo, which feeds directly into the Abavus CRM system. Defects reported through this platform are investigated and logged in Mayrise.

What happens after a pothole is reported

Once a pothole or highway defect is reported, it will be inspected within three working days. If the inspection determines that the defect presents a sufficient risk, a repair works order will be raised. Depending on the nature of the repair required, the works order will either be allocated to an engineer for further assessment or, where a priority response is necessary, automatically assigned to the operations team for repair.

What we spend to maintain the highway network and where the funding is coming from

Spending on highways maintenance
Highway maintenance 2024-25 2025-26 2026-27 (projected)
Total spend on highways maintenance £5,506,000 £6,598,500 £6,324,390
Spent on carriageways £766,776.96 £2,194,938.98 £2,269,000
Spent on footways £256,490.45 £469,857.05 £320,000
Structures (for example bridges or tunnels) £286,452.50 £154,072.40 £180,000
Drainage £253,410.10 £645,366.09 £300,000
Street lighting (including Energy) £1,389,797.23 £1,261,784.19 £1,400,000
Other assets £0 £0 £77,000

Where our funding for highways maintenance comes from

Funding sources
Funding sources for highways maintenance 2024-25 2025-26 2026-27 (projected)
Funding received through the Department for Transport / UK Government £2,118,000 £4,009,190 £3,103,000
[if applicable]: Additional highways maintenance funding provided by the Council or third parties £3,429,000 £3,652,500 £3,652,500
Total £5,547,000 £7,661,690 £6,324,390

Our maintenance plans for this year

Our plans for highways maintenance for 2026-27

  • Minor revision to Highways Asset Management Plan In lieu of recent updates to local corporate policies.
  • Feasibility study of a new AI Survey system.
  • Potential new reactive material testing.
  • Reconstruction and Resurfacing Schemes to take place throughout the year, around 2.1KM in length.
  • Surface Dressing to commence in August 2026, around 7.2KM in length.
Full list of planned carriageway and footway works
Street Name Length Unit Repair Notes
Higher Warborough Road 616 m Surface Dressing
Manor Vale Road 420 m Surface Dressing
Manor Bend 461 m Surface Dressing
Barnfield Close 428 m Surface Dressing
Vale Close 97 m Surface Dressing
Brunel Road 803 m Surface Dressing
Lower Fowden 564 m Surface Dressing
Long Wools 318 m Surface Dressing
Winner Street 215 m Reconstruction and Resurfacing
Hellevoetsluis Way (A380) 400 m Reconstruction and Resurfacing
Fleet Street 25 m Reconstruction and Resurfacing
Tweenaway Cross (A385/A3022) 625 m2 Reconstruction and Resurfacing Major Junction
Dartmouth Road (A3022) 1.1 km Reconstruction and Resurfacing
Torbay Road (A379) 400 m Reconstruction and resurfacing
Marldon Road (B3060) 70x4 m Reconstruction and Resurfacing
Smallcombe Road 100 m Reconstruction and Resurfacing
Mincent Hill 400 m Footway Replacement and Reconstruction 850m2

How decisions are made on our maintenance plans

Our strategy is to maximise the value of available funding by delivering the right treatment at the right time, extending asset life and reducing the need for more costly reconstruction and resurfacing. Where roads have reached the end of their serviceable life, full reconstruction remains an important part of our capital programme.

A risk-based highway inspection regime, aligned with our Highways Asset Management Policy and Strategy, supports this approach, with priority given to strategic routes, public transport corridors and resilient network links.

For footways, we are transitioning from traditional modular surfaces to more durable bitumen-based materials in residential and district centre locations, while continuing to address defects identified through our inspection regime across the network. Modular footway surfaces will continue to be used in higher-profile locations where they remain the most appropriate solution.

Annual condition surveys undertaken with WDM LTD inform investment decisions and performance monitoring. We are also exploring the use of artificial intelligence to improve our understanding of asset condition and identify opportunities for earlier intervention, helping to enhance network performance, resilience and value for money.